Los Angeles County has stormwater regulation standards required for a Beverly Hills project, and FocalPoint was the answer!
In addition, the owner will save $29,000!!
Problem:
- The challenge was that there was not enough space for a traditional pre-cast concrete system.
- Cost of pre-cast concrete system = $58,000
Solution:
- FocalPoint has the ability to split, scale and fit where there is space for it. California Filtration Specialists designed a 60’ x 2.5’ biofiltration system which fit between the building and adjacent sidewalk.
- Cost of FocalPoint biofiltration system = $29,000