Case Studies

Caprock, CA

R-Tank
CFS and Whitson Contracting & Management teamed up to provide and install two stormwater infiltration systems designed to capture over 800,000cf of stormwater. This logistics facility located in California’s Central Valley called for an accelerated construction schedule with an emphasis on the site development scopes of work.

City of San Clemente

Fabco Stormwater Solutions
The city of San Clemente’s maintenance yard for their Water Reclamation Plant (WRP) had a stormwater runoff exceedance of TSS and phosphorus. The city approached CA Filtration Specialists to discuss how best to treat their stormwater runoff

Hotel Del, Coronado

Focal Point
During a 2019 improvement project of the Hotel Del, Coronado, the installation of a stormwater quality system was required. The Engineer of Record contacted CA Filtration Specialists with a need for a system that could fit within their remodel footprint.

Hickman, CA Parjana Site

EGRP
Installation of Parjana energy-passive groundwater recharge products (EGRP) aided in the natural directional moment of groundwater flow with minimal ecological disturbance.

U-Haul Facilify in Lake Forest

Ecoraster

The city of San Clemente’s maintenance yard for their Water Reclamation Plant (WRP) had a stormwater runoff exceedance of TSS and phosphorus. The city approached CA Filtration Specialists to discuss how best to treat their stormwater runoff

Additional Studies