Case Studies

Caprock, Ca

R-Tank

California Filtration Specialists and Whitson Contracting & Management teamed up to provide and install two stormwater infiltration systems designed to capture over 800,000cf of stormwater. This logistics facility was located in California’s Central Valley and the entire facility needed to be constructed in an accelerated schedule with emphasis on the site development scopes of work. Beyond the fast-track schedule, other issues that needed to be addressed was the required depth of the system, height of the tanks,limited space on

Read full Case Study

City of San Clemente

The city of San Clemente’s maintenance yard for their Water Reclamation Plant (WRP) had a stormwater runoff exceedance of TSS and phosphorus. The city approached CA Filtration Specialists to discuss how best to treat their stormwater runoff

Read full Case Study

Hotel Del, Coronado

During a 2019 improvement project of the Hotel Del, Coronado, the installation of a stormwater quality system was required. The Engineer of Record contacted CA Filtration Specialists with a need for a system that could fit within their remodel footprint.

Read full Case Study

Hickman, CA Parjana Site

EGRP

Installation of Parjana energy-passive groundwater recharge products (EGRP) aided in the natural directional moment of groundwater flow with minimal ecological disturbance.

Read full Case Study

U-Haul Facilify in Lake Forest

The city of San Clemente’s maintenance yard for their Water Reclamation Plant (WRP) had a stormwater runoff exceedance of TSS and phosphorus. The city approached CA Filtration Specialists to discuss how best to treat their stormwater runoff

Read full Case Study

Addtional Studies

CFS is proud to introduce the next generation of post-construction BMPs, featuring infiltration, biofiltration, pre-treatment and filtration and rainwater harvesting products