infiltration

Sierra Madre ACO StormBrixx install

a construction site

ACO StormBrixx® is designed for surface water detention, retention, infiltration and reuse. Its versatility allows it to be used in applications across all construction environments as a Sustainable Drainage System. In this particular instance, our designbuild team was able to design the shape of the tank around the architects’ landscape plans for this high-end development

Sierra Madre ACO StormBrixx install Read More »

PaveDrain system installation at Ontario International Airport

Pavedrain at Ontario International Airport

Ontario International Airport was looking to install a trench drain at the airport. The design-build team of CFS and WCM provided and installed a PaveDrain system in-lieu of a more costly traditional steel grated system. PaveDrain’s flow rate of over 1,500in/hr/sf will easily infiltrate any sheet flows required. Contact CA Filtration Specialists for Design Solutions.

PaveDrain system installation at Ontario International Airport Read More »

Earth Day 2025

Earth Day 2025

On Earth Day, CFS is proud to offer the Pave Drain system that delivers stormwater infiltration, pollution reduction, and pavement longevity, all while minimizing the need for maintenance/replacement.

Earth Day 2025 Read More »

GROUNDWATER AWARENESS WEEK

GEPS®: Ground Energy Passive System

It is officially, “GROUNDWATER AWARENESS WEEK”, and the perfect time to talk about GEPS®: Ground Energy Passive System. GEPS® facilitates water-ground interaction akin to diffusion by passively distributing moisture throughout the soil volumetrically. In soils with low permeability, GEPS® promotes lateral moisture distribution between soil layers thus creating infiltration. GEPS will recharge our groundwater. Our

GROUNDWATER AWARENESS WEEK Read More »

Orange County, CA gets a new FocalPoint System Installation

focal point installation

A large FocalPoint system was built in Orange County, CA at the same time that the construction of a housing development was occuring. Because of this, large sediment loads prevented the system from functioning properly. Whitson CM worked with CEC to design an adjacent structure with more robust sediment control and dissipation capabilities. Following the

Orange County, CA gets a new FocalPoint System Installation Read More »